Project record · Church restoration

A church restoration project's finial reproduction.

A parish church needed to reinstate a finial that had fallen from the east tower during a storm. One surviving finial on the west tower gave us the pattern. Silicone bench mould, matched lime concrete casting.

SectorEcclesiastical
RouteSilicone from survivor
Cast inLime concrete
AttendSite & workshop

The brief

The brief in one paragraph.

Original church finial section prepared as the master for reproduction
Original finial used as the master pattern

A parish church had lost a finial from the east tower during a storm. The finial had shattered on impact and wasn't recoverable. The west tower still carried its matching original. The parish's specifying architect asked whether we could reproduce the finial from the survivor and, in view of the church's age and material, cast it in matched lime concrete rather than ordinary cast stone.

The problem

The problem was pattern access at height.

The surviving finial was 24 metres up on the west tower. Scaffold access was possible but expensive; the parish's budget was limited and heritage grant funding needed to stretch across the whole reinstatement.

In-situ silicone moulding at that height was the wrong economics for a single finial. The alternative — carefully removing the surviving finial, moulding it on the bench, and reinstating it — needed the conservation officer's approval and had to be done without damage.

Removed church finial section protected on supports for bench moulding

How we solved it

How we approached it.

01

Methodology agreement

Conservation officer visited site with the specifying architect. Agreed the survivor could be carefully removed for bench moulding, provided the removal and reinstatement were carried out by qualified stonemasons and documented.

02

Removal and workshop moulding

Stonemasons removed the survivor and delivered it to our workshop. Silicone bench mould with a rigid mother mould. Splice on the underside where it sits into the tower — invisible in place.

03

Lime concrete casting

Two reproductions cast in matched lime concrete (one for immediate installation, one as spare). Slower cure than cement-based concrete; different handling regime for the yard team, briefed accordingly.

04

Reinstatement

Original returned to the west tower and reinstalled. New reproduction installed on the east tower. Second reproduction retained on the church's storage against future need.

Church finial reproduction process with original, mould and lime concrete cast
Workshop stages for reproducing the tower finial

The outcome

How it worked out.

Both towers now carry finials — the survivor back in place on the west, a matched reproduction on the east. The spare sits in the parish's storage. Total cost to the parish was well within the heritage grant budget, largely because the moulding was done on the bench rather than in situ.

Lessons

What we'd tell the next person with this problem.

For genuinely inaccessible originals, sometimes the cheapest route is the one that seems most heroic — carefully removing the original for bench work, then reinstating it. Always with the conservation team's involvement, but often more affordable than the scaffold-and-in-situ alternative.

At a glance

The idea in a picture.

How a two-part mould fits together

Pour spoutAir ventSplit lineYour part in the cavityFlexible siliconeRigidmother mould

Swipe to see the whole diagram

The silicone holds the detail, the rigid case keeps it true, and the split line lets the part come out without tearing.

Get in touch

Send us a photograph of the panel or the elevation.

One photograph tells us what surface you're chasing, and one line about the mix tells us what silicone or polyurethane will survive it.

Real people, a real workshop

You deal with the people who make it.

No call centre and no middlemen. When you contact TCI Construction, you speak to the team who design, build and check your mould.

  • A real Warwickshire workshopUnit 15, Waterloo Park, Bidford-on-Avon, Alcester B50 4JG.
  • Real people on the phoneCall the team on 01789 224228, Monday to Friday.
  • The same team on every jobDesign, production and aftercare come from the people you see here.
  • Part of TCI GroupFive specialist brands, one engineering team. Visit TCI Group.
The TCI design and project office.
The TCI design and project office.
The TCI workshop, with moulds on the bench mid-build.
The TCI workshop, with moulds on the bench mid-build.