
For precast yards
Formliners, unit moulds and replacements that survive the bed, the wash and the second pour.
Read the sector pageTCI Construction · Sectors
The silicone and polyurethane are the same. The questions aren't. A precast yard asks about pour counts, an architect about texture intent, a conservation officer about the original. Each sector page is written around those questions.
How to use this page

Pick the sector that's closest to how you work. If you sit between two — a precaster who does a lot of heritage work, a landscape architect who also specifies cladding — read both. The tooling underneath overlaps heavily.
We split the sectors into two families: the precast trade that casts the concrete, and the architecture and specification side that decides what it should look like.
All eight

Formliners, unit moulds and replacements that survive the bed, the wash and the second pour.
Read the sector page
GRC tooling, matched multi-panel sets and architect-signed reliefs, delivered as a system.
Read the sector page
Moulds taken from surviving sections, in situ or on the bench, for listed replication.
Read the sector page
Bench ends, bollards, planters and paving relief — for yards that mix repeat lines with civic bespoke.
Read the sector page
Written material specs, bespoke reliefs, and early-stage tooling advice — before the design is frozen.
Read the sector page
Cills, keystones, quoins and dressed-stone reproductions with the arris held pour after pour.
Read the sector page
Bespoke bollards, seating, planters and paving relief for town-centre and waterfront schemes.
Read the sector page
Copings, steps, edging, retaining units and bespoke specials for contractors casting their own or buying in.
Read the sector pageSame in every sector
Every enquiry gets a real response the working day it lands.
We recommend the tooling route that suits your job, with the reasoning.
Documented material spec and handling note with every tool.
So replacements match, whenever they're needed.

Not sure where you fit?
Plenty of enquiries don't fit a sector neatly. A photograph of the piece and a line about the mix is enough to start.
Call 01789 224228 or send an enquiry.

At a glance
How a two-part mould fits together
Swipe to see the whole diagram
Get in touch
One photograph tells us what surface you're chasing, and one line about the mix tells us what silicone or polyurethane will survive it.
Real people, a real workshop
No call centre and no middlemen. When you contact TCI Construction, you speak to the team who design, build and check your mould.


Thomas LaneManaging Director
George PrestonDesign & Project Manager
Kelly BallingerHead of Partnerships
Jim AndertonProduction Manager
TheodoreEmployee Welfare