Bidford-on-Avon, Warwickshire. Mon to Fri.01789 224228

Project record · Public realm bollards

Bespoke bollard tooling for a marina regeneration.

A landscape architect wanted a mooring-post-inspired bollard with a rope relief band for a marina frontage. A split polyurethane mould with a silicone relief insert gave the precaster a dense, salt-tolerant cast every time.

SectorPublic realm
RouteSplit + insert
Cast inWet-cast precast
SettingCoastal

The brief

The brief in one paragraph.

Two matched split bollard moulds for mooring-post shaped precast castings
Matched moulds for a marina bollard run

A precaster had won the street furniture package on a marina regeneration. The landscape architect's design was a squat bollard shaped like a mooring post, with a rope-effect relief band below the cap. The run was large enough to justify proper tooling and the precaster wanted two matched moulds to keep pace with the programme.

The problem

The shoulder, the rope and the salt.

The cap overhangs the shaft, which creates an undercut a one-piece rigid mould can't release. The rope band needed fine detail that polyurethane alone would soften over a long run.

The setting was coastal, so the designer wanted a dense, well-compacted face with no blowholes on the relief where salt could get a foothold.

Bollard mould undercut and silicone rope insert with clean concrete sample

How we solved it

How we approached it.

01

Pattern review with the designer

A machined pattern sent to the landscape architect for sign-off on the cap radius and rope pitch before any moulding.

02

Split on the hidden line

A two-part polyurethane body split along the back of the bollard, facing the kerb, so the line never faced the promenade.

03

Silicone rope insert

The rope band cast as a silicone insert seated in the polyurethane, so the fine detail stayed sharp across the run.

04

Vent and vibration plan

Vents at the cap underside and a vibration regime agreed with the precaster to keep the relief face dense.

05

Matched pair

Two identical moulds from the same pattern and material batch, labelled as a set.

The outcome

How it worked out.

The precaster ran both moulds in parallel through the programme. The designer approved the first cast at the yard, and the council's maintenance team now have a documented route to a matching replacement when one is inevitably struck by a vehicle.

Lessons

What we'd tell the next person with this problem.

On public realm pieces, ask early which face is seen and which faces the kerb or the wall. It's the single most useful fact for placing a split line.

Get in touch

Send us a photograph of the panel or the elevation.

One photograph tells us what surface you're chasing, and one line about the mix tells us what silicone or polyurethane will survive it.

Real people, a real workshop

You deal with the people who make it.

No call centre and no middlemen. When you contact TCI Construction, you speak to the team who design, build and check your mould.

  • A real Warwickshire workshopUnit 15, Waterloo Park, Bidford-on-Avon, Alcester B50 4JG.
  • Real people on the phoneCall the team on 01789 224228, Monday to Friday.
  • The same team on every jobDesign, production and aftercare come from the people you see here.
  • Part of TCI GroupFive specialist brands, one engineering team. Visit TCI Group.
The TCI design and project office.
The TCI design and project office.
The TCI workshop, with moulds on the bench mid-build.
The TCI workshop, with moulds on the bench mid-build.
  • Thomas LaneManaging Director
  • George PrestonDesign & Project Manager
  • Kelly BallingerHead of Partnerships
  • Jim AndertonProduction Manager
  • TheodoreEmployee Welfare
Meet the team