Bidford-on-Avon, Warwickshire. Mon to Fri.01789 224228

Worked example · Public realm bollards

Bespoke bollard tooling for a marina regeneration.

Take a landscape architect who wants a mooring-post-inspired bollard with a rope relief band for a marina frontage. A split polyurethane mould with a silicone relief insert is designed to give a dense, well-compacted face suited to a coastal setting.

SectorPublic realm
RouteSplit + insert
Cast inWet-cast precast
SettingCoastal

The brief

The brief in one paragraph.

Illustrative example: Two matched split bollard moulds for mooring-post shaped precast castings
Matched moulds for a marina bollard run

Take a marina regeneration with a bespoke mooring-post bollard. The design is a squat bollard shaped like a mooring post, with a rope-effect relief band below the cap. The run is large enough to justify proper tooling, and the precaster wants two matched moulds to keep pace with the programme.

The problem

The shoulder, the rope and the salt.

The cap overhangs the shaft, which creates an undercut a one-piece rigid mould can't release. The rope band needed fine detail that polyurethane alone would soften over a long run.

The setting is coastal, so the designer wants a dense, well-compacted face with no blowholes on the relief where salt could get a foothold.

Illustrative example: Bollard mould undercut and silicone rope insert with clean concrete sample

How we would approach it

How we would approach a brief like this.

01

Pattern review with the designer

A machined pattern sent to the landscape architect for sign-off on the cap radius and rope pitch before any moulding.

02

Split on the hidden line

A two-part polyurethane body split along the back of the bollard, facing the kerb, so the line doesn't face the promenade.

03

Silicone rope insert

The rope band cast as a silicone insert seated in the polyurethane, to keep the fine detail sharp across the run.

04

Vent and vibration plan

Vents at the cap underside and a vibration regime agreed with the precaster to keep the relief face dense.

05

Matched pair

Two identical moulds from the same pattern and material batch, labelled as a set.

The likely result

How a brief like this typically works out.

On a brief like this, the precaster would typically run both moulds in parallel through the programme, with the designer approving the first cast at the yard. We keep your masters and drawings on file so repeats are straightforward, including a matching replacement if a bollard is struck by a vehicle.

Lessons

What we'd tell anyone with a brief like this.

On public realm pieces, ask early which face is seen and which faces the kerb or the wall. It's the single most useful fact for placing a split line.

Get in touch

Send us a photograph of the panel or the elevation.

One photograph tells us what surface you're chasing, and one line about the mix tells us what silicone or polyurethane will survive it.

Real people, a real workshop

You deal with the people who make it.

No call centre and no middlemen. When you contact TCI Construction, you speak to the team who design, build and check your mould.

  • A real Warwickshire workshopUnit 15, Waterloo Park, Bidford-on-Avon, Alcester B50 4JG.
  • Real people on the phoneCall the team on 01789 224228, Monday to Friday.
  • The same team on every jobDesign, production and aftercare come from the people you see here.
  • Part of TCI GroupFour specialist divisions under TCI Group, one engineering team. Visit TCI Group.
Representative image: a design and project office.
Representative image: a design and project office.
Representative image: moulds on the bench mid-build.
Representative image: moulds on the bench mid-build.
  • Thomas LaneManaging Director
  • George PrestonDesign & Project Manager
  • Kelly BallingerHead of Partnerships
  • Jim AndertonProduction Manager
  • TheodoreEmployee Welfare
Meet the team