Bidford-on-Avon, Warwickshire. Mon to Fri.01789 224228

What we make › Multi-panel tooling › Matched tool sets

Multi-panel tooling · Matched tool sets

Matched tool sets for parallel beds.

Sets of identical formliners or unit moulds poured from one pattern, so every bed in your yard produces the same panel.

Overview

Matched tool sets, in plain terms.

Several identical formliner tools aligned side by side for matching
A matched set of liners checked against each other

When a programme runs across several beds, every tool must match. Small differences show on the elevation.

We pour sets from the same pattern and, where possible, the same material batch.

What sets it apart

Four things that define this route.

01

One pattern

Every tool from the same master.

02

Same batch

Consistent material where possible.

03

Labelled sets

Clear identification per bed.

04

Add later

More tools from the archived pattern.

How we build it

From pattern to released tool.

We plan the set size with your output and cure time.

Each tool is checked against the pattern before dispatch.

Formliner tool beside its master pattern ready for final checking

The honest bit

What to know before you commit.

Mixing old and new tools on one elevation can read. Plan retirements.

FAQs

Questions we hear about this.

Can we add a tool later?

Yes, from the archive.

How many do we need?

We'll help calculate from output.

Get in touch

Send us a photograph of the panel or the elevation.

One photograph tells us what surface you're chasing, and one line about the mix tells us what silicone or polyurethane will survive it.

Real people, a real workshop

You deal with the people who make it.

No call centre and no middlemen. When you contact TCI Construction, you speak to the team who design, build and check your mould.

  • A real Warwickshire workshopUnit 15, Waterloo Park, Bidford-on-Avon, Alcester B50 4JG.
  • Real people on the phoneCall the team on 01789 224228, Monday to Friday.
  • The same team on every jobDesign, production and aftercare come from the people you see here.
  • Part of TCI GroupFive specialist brands, one engineering team. Visit TCI Group.
The TCI design and project office.
The TCI design and project office.
The TCI workshop, with moulds on the bench mid-build.
The TCI workshop, with moulds on the bench mid-build.
  • Thomas LaneManaging Director
  • George PrestonDesign & Project Manager
  • Kelly BallingerHead of Partnerships
  • Jim AndertonProduction Manager
  • TheodoreEmployee Welfare
Meet the team